Patio sub base calculator
WebApr 27, 2024 · Calculate the depth of the sub-base next. Allow for 100mm of hardcore, a thin layer of sand, 50mm of mortar, and the depth of the paving slabs. Dig the area out to this depth. To incorporate the drainage slope into the sub-base you will need to use timber pegs. Measure from the top of the pegs and mark them to show the depth of the sub … WebMay 23, 2024 · 1. Multiply the length of your project area by the width to get the area's square footage. 2. Multiply the square footage of the project area by 0.01235, instructs Braen Supply. The result is the...
Patio sub base calculator
Did you know?
WebThe patio is to be 4.2m wide, so if that distance (the run) is divided by 60, the result is the 1 unit of fall. We'll work in millimetres rather than metres... From the above.... Fall = 4,200mm ÷ 60 = 70mm So, there needs to be 70mm of fall across the patio. To check: 1:60 = 1÷60 = 0.0167 70 ÷ 4200 = 0.0167 Example 2: WebSub Base; This form will calculate the approximate metric tonnes of unconsolidated DTp1 required for the entered area. Dimensions. Length in Metres: Width in Metres: Area in Sq Meters: Desired compacted depth in mm: Materials. Crusher Run :
WebDec 1, 2024 · Calculate How Much MOT Type 1 You Need for Block Paving Sub-Base. There is a formula for calculating how much sub-base or MOT type 1, to be specific, you need under your block paving. It’s the area of the paving x depth x 1.6-1.8. One bulk bag of MOT Type 1 that’s of a ton will cover 10 square meters at 50mm depth and multiply that … WebJan 20, 2024 · Patio Sand Base Calculations To find out how much sand base you will need for your patio, start with the square footage of the patio and multiply it by 144 to convert to inches. Multiply this result by the depth of the sand base, and then finally divide the result by 46,656 to convert to cubic yards. Sound complicated?
WebOct 1, 2024 · A traditional base for a paver or stone patio is a 6-inch-deep layer of compacted gravel. For a typical 10 x 12-foot patio, that means carting away about 2-1/2 tons of soil, and hauling in the same amount of gravel. But there’s an easier way. Let plastic panels take the place of the gravel base.
WebMeasure the length and width in metres of the area you wish to fill with a sub base aggregate e.g. 20m x 10m Multiply the length and width to find the area in square metres. Multiply by the depth e.g. 150mm Multiply by 2 to get the tonnage required Example: Length 20m x width 10m = 200 sqm 200 (length x width) x 0.150 (depth) x 2 = 60 tonnes
WebDec 1, 2024 · Calculate How Much MOT Type 1 You Need for Block Paving Sub-Base. There is a formula for calculating how much sub-base or MOT type 1, to be specific, you need under your block paving. It’s the area of the paving x depth x 1.6-1.8. One bulk bag of MOT Type 1 that’s of a ton will cover 10 square meters at 50mm depth and multiply that … mario\u0027s via abruzzi rochester nyWebApr 27, 2024 · For a patio laid this way choose a well-drained area. Using a spade, dig out the chosen area to about 6 inches (150mm) and level it. Lay road base/hardcore to a compacted depth of 2 inches (50mm), then repeat to create a 4 inch (100mm) sub base. On top, lay a 2 inch (50mm) layer of sharp sand. dan grna attorney toledoWebSub-base material calculator Enter the area in square-metres (m²) and depth in millimetres (mm) for your patio's sub-base, and find out how much DTp1 hardcore (MOT Type 1 aggregate) you'll need. Area Square Meters (m²) Depth of Sub-base (mm) Recommended tonnes (1000kg) of DTp1 Bedding mortar (5:1 mix) materials calculator mario\u0027s uttoxeter menuWebPaving Installation Calculator STEP 1: Where will the paving be located? STEP 2: Enter the width and length, or enter the area (m 2) if you already know it. Results: width (m): length (m): area (m 2 ): Concrete sand required: Weed membrane required: Sub-base required: Our bulk bags of concrete sand vary from 850kg - 1000kg. dangtoon56.comWebJan 20, 2024 · Your calculations would look like this: 16 x 18 = 288 square feet. 4 x 8 = 32 square inches. 32 / 144 = 0.22 square feet. 288 / 0.22 = 1,310 pavers needed. And to find the amount of sand base, you would follow these steps: 16 x 18 = 288 square feet. 288 x 144 = 41,472 square inches. 41,472 x 2 = 82,944 cubic inches. dan gritti rice footballWebOur Patio Base Calculator is a valuable tool for anyone planning to build a patio or other outdoor structure. By entering the dimensions of your patio, as well as the type and thickness of the base material, our calculator can help you determine how much material you'll need and estimate the cost of the project. mario\u0027s time machine snesWebOct 1, 2024 · Spread out a layer of sand that’s an average depth of 3/4 inches. Screed the sand layer to provide a flat, properly sloped surface for the paver patio base panels. Pro tip: Buy all-purpose or fill sand, not sandbox sand. It’s too fine. If you’re buying bags of sand, figure about one 50-lb. bag for every 8 square feet of patio. dang \\u0026 associates